|
Still deciding? Get samples of $ !
Request Sample
|
| Customization: | Available |
|---|---|
| Type: | Self-Starting Diesel Generator |
| Installation Method: | Fixed |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Equipment | Model | Technical Specifications | Quantity | Function Description |
UPS | UPS-100kVA | Input: 380VAC; Output: 380VAC; Battery voltage: 480VDC; Efficiency: 95%; Switchover: 0ms | 2 units (parallel operation) | Zero-interruption protection for primary critical loads |
PCS (Bi-directional Converter) | PCS-200kW | Bi-directional; Efficiency: 97%; THDi < 3%; Grid-tied/Islanded switching; Detection < 10ms, Switchover < 20ms; Phase difference < 2° | 1 set | Peak shaving & valley filling, seamless emergency backup, microgrid support |
Battery (LFP) | LFP-500kWh | Cell: 3.2V/280Ah; Cycle life: 6000 cycles @ 80% DoD | 1 set | 2-hour emergency backup + capacity base for peak-valley arbitrage |
Generator | DG-400kW | Silent type; Rated: 400kW; Standby: 440kW; Cold start ≤ 10s; Load pickup ≤ 30s | 1 unit | Long-term backup for sustained power outage scenarios |
Intelligent Distribution Cabinet (ATS/Quad Power) | ATS-S400 | Quad power automatic switching (Grid 1/Grid 2/ESS/DG); Switchover < 100ms; Interlocking + graded protection | 1 set | Power dispatch and switching logic hub |
Energy Management System | EMS-Pro | Monitoring + analysis + optimization + forecasting; Communication: Modbus/BACnet | 1 set | System brain: strategy control, alarms, reports |
Active Power Filter | APF-150A | Harmonic compensation, system THDi suppressed to < 5% | 1 set | Power quality improvement, reducing risks for IT/precision loads |
Isolation Transformer | IT-400kVA | Input: 540VDC side matching; Output: 380VAC side isolation; Harmonic blocking + safety isolation (engineering configuration) | 1 unit | Electrical isolation, harmonic conduction blocking, output matching |
DC Fuse | aR-100kA | Breaking capacity: 100kA; Response: 0.1ms | Several | Fast isolation protection for DC short circuits |
Surge Protective Device | SPD-I/III | Class I impulse current ≥ 25kA; Class III residual voltage < 1.5kV; Grounding cable ≤ 0.5m | Several | Lightning/switching overvoltage protection for IGBTs and control boards |
Rectifier (Optional Module) | Rectifier-100/200/400kW | Input: 3-phase 380VAC±10%, 50Hz; Output: 540VDC±1%; Efficiency ≥ 96%; PF ≥ 0.99; THDi < 5% | Optional | AC→DC energy supply and busbar stabilization, supporting high-reliability conversion links |
Inverter (Optional Module) | Inverter-380V | Input: 480–600VDC; Output: 380VAC 3-phase 4-wire; THDv < 3%; Overload: 125%/10min, 150%/1min; Switchover < 10ms | Optional | DC→AC pure sine wave output, ensuring quality power supply for critical loads |











Technical Specifications | ||
1 | Electrical Parameters | Rated Voltage: 380V / 400V / 415V / 480V (customizable) Frequency: 50Hz / 60Hz UPS Switching Time: 0 ms (critical load path) PCS Grid Transition Time: <20 ms ATS Transfer Time: ≤100 ms System Efficiency: ≥95% (overall architecture) |
2 | Energy Storage System (BESS) | Battery Type: Lithium Iron Phosphate (LFP) Battery Capacity Range: 100 kWh – 2 MWh Cell Specification: 3.2V / 280Ah (typical) Cycle Life: ≥6000 cycles @ 80% DoD Depth of Discharge: 80% standard Battery Management System: Integrated BMS with thermal monitoring |
3 | Power Conversion System (PCS) | Rated Power: 50 kW – 500 kW Bidirectional Conversion: Yes Conversion Efficiency: ≥97% Total Harmonic Distortion (THDi): <3% Parallel Operation: Supported Microgrid Mode: Supported |
4 | Diesel Generator | Power Range: 100 kW – 1000 kW Startup Time: ≤10 seconds Load Acceptance Time: ≤30 seconds Fuel Type: Diesel Noise Level: Silent enclosure optional |
5 | Protection & Power Quality | Harmonic Filter (APF): THDi <5% Isolation Transformer: Optional DC Fuse Breaking Capacity: Up to 100 kA Surge Protection: Class I & Class III supported |
6 | Communication & Monitoring | Protocol: Modbus / BACnet Remote Monitoring: Supported Energy Optimization: Supported Load Strategy Programming: Supported |
7 | Solution Note on Photovoltaic (PV) Integration | The default solution does not include PV to ensure the predictability and high reliability of emergency power supply. If the project requires PV integration, it can be designed as an extended item separately (subject to grid connection approval, anti-backflow measures, and protection strategy upgrade). |
